Thursday, April 30, 2015
Adventures in Plumbing!
I can't tell you how relieved I am to be done with all the plumbing work. One headache of incompatibility after another. No ones fault in particular, but some communication was definitely lost at times. Nonetheless, it all worked out!
Thursday, April 23, 2015
Under the dust and dirt...
There is a halfway decent looking concrete floor! It was quite a relief to see, actually. This pic is just a tease of some of our long term plans for the floor....
Tuesday, April 14, 2015
Let there be light!
The electricians have been busy. It's fun seeing our plan for lighting come to life.
Note: the following pics are not the final configuration or bulb types. No outdoor fixtures yet or lamps inside, obviously.
Tile you were waiting...
.. for a new blog post, Sebastien has been helping me make a big push on tiling the master bathroom. Thanks dude!
Started with a base of cement board.
Tuesday, April 7, 2015
Friends and paint and stuff
Thanks to Dave and Ari for helping us paint some ceilings! Meanwhile, I focused on the master bathroom tile prep.
Thursday, April 2, 2015
Monday, March 23, 2015
The first bit of paint.
Tuesday, March 17, 2015
Our House is Getting Dressed
Monday, March 16, 2015
MUD.
Blarg! The mud. Oh, the mud.
Thankfully the majority of our native soils are sandy. This part of the driveway, however, is not native soil. It is crap-slop, and I've yet to fully remedy the situation. As soon as the ground thaws fully it'll be fine, but until then.... crap slop.
I am also thankful for this 4wd diesel beast that loves to pull around the crap-slop.
As well as carry all the things!
Thursday, March 12, 2015
Deciding on Siding
The snow is finally melting! whaa-hoooo! We can see dirt for the first time in months.

Of course, that means we're into mud-season now. blarg.... lot of melting still to go, too. The burn-able wood pile continues to grow though (bonfire, anyone?)
Our cedar siding is on-site. Yum.

Here is the siding plan. Makes sense, right? 3 materials, mostly just because we could.
Wednesday, March 4, 2015
Getting the walls dry, then, drywall
Well, it's about to get dusty in here. Drywall is all stacked and staged. We had to hit the brakes for a couple frantic days of last-minute preparations though! And give time to keep running the heater and de-humidifier for a couple more days. Still kinda steamy in there.
Friday, February 27, 2015
Hot damn.
Thursday, February 26, 2015
Tightened UP and HOLDING the HEAT!
Finally, it is warm in house Gladwin. Rejoice, good humans, for the heat shall now remain.
Or something like that.
But yeah, very pumped to have it insulated! Pictures of foamy and fuzzy goodness to follow:
Entryway room ceiling/roof done in all spray foam (thanks to whoever decided that!)
Or something like that.
But yeah, very pumped to have it insulated! Pictures of foamy and fuzzy goodness to follow:
Entryway room ceiling/roof done in all spray foam (thanks to whoever decided that!)
Each piece of blocking installed right between rafters and side overhang supports was blasted with a thick picture-frame of closed cell spray foam to keep the roof assembly air-TIGHT. No vented roof for this house...
Closer look at the foam. Also notice the extensive caulking around headers, top plates, etc. Good stuff!
And then the cellulose went in the next day!
Wednesday, February 25, 2015
Holes Through the Roof
We have four of them now. And hopefully that's all we'll ever have.
Wood stove, plumbing/septic drain vent, passive radon vent, and the range hood exhaust fan.
Wood stove, plumbing/septic drain vent, passive radon vent, and the range hood exhaust fan.
They are now underway with the roof overhang soffit and fascia boards. Closing in on ready-for-roofing status (once the f&*#ing snow finally melts)!
Monday, February 16, 2015
Shut the front door...
We have a front door! With a lock! That is all.
I'm in Sweden this week so hopefully there's all sorts of good progress to post about after I get back.
Tuesday, February 10, 2015
(Almost) Done Roughin' it.
No... The Gladwins are not done roughing it in our current housing accommodations, and all ready to move in.... don't get too excited. I just mean that our building crew is almost done with all the rough framing, electrical and plumbing.
Sorry for the long post delay, we've been busy/travelling/snowed-in. etc.
I think this ladder is a bit big for Zachary. The master bathroom window is in! Wonderful.
My folks joined us to check out the progress!
Our fancy HRV (Heat Recovery Ventilator) System. More on this setup in a future post. But basically, we plan to insulate our house so tight that the air quality would suffer if we didn't intentionally ventilate. This unit allows us to do that without wasting too much energy by exchanging enthalpy between the outgoing and incoming air streams.
Our "control room" is coming together. Going to be a lot of important functions packed into our little utility room. Water pressure regulation/filtration/conditioning, electrical circuit control, storage, washer/dryer/freezer, and various technology hubs.
Sorry for the long post delay, we've been busy/travelling/snowed-in. etc.
An entryway (mudroom) is finally built!
I think this ladder is a bit big for Zachary. The master bathroom window is in! Wonderful.
My folks joined us to check out the progress!
I am excited about this deal right here. A nice flat roof over the entry porch and mudroom. In the future, it will have a neat extra feature. Excuse the trash pile in the foreground... there's too much snow to put it anywhere else right now.
Our "control room" is coming together. Going to be a lot of important functions packed into our little utility room. Water pressure regulation/filtration/conditioning, electrical circuit control, storage, washer/dryer/freezer, and various technology hubs.