Started with a base of cement board.
Which needed smoothing out with some thinset, and waterproofing with a membrane layer of redgard.
Sebastien surveys the room. First-course leveling boards are installed around the perimeter of the area to be tiled.
The first tile goes on:
Opted for a 2" stagger
Hundreds of tiles later.
Whoof, that'll do for now. Back at it soon though!
No comments:
Post a Comment